Quality Management

Quality touches every process: what you receive, what you make, what you ship, and what comes back. In regulated industries it’s the module that keeps the company licensed.

The quality processes

INCOMING          IN-PROCESS         FINAL           CUSTOMER
Goods receipt  →  During production → Before ship  →  Complaints
inspection        checks              inspection      returns
     │                 │                  │              │
     └─────────────────┴──────────────────┴──────────────┘
                              │
                    Non-conformance → Investigation → CAPA
                              │
                    Supplier quality / Audits / Certification

Inspection lots

The core transactional object:

inspection_lot(
  id, lot_number, inspection_type,
  material_id, batch, plant_id, storage_location,
  reference_document,        -- PO, production order, delivery
  quantity_inspected, uom,
  inspection_plan_id, sample_size,
  status,                    -- CREATED | IN_INSPECTION | RESULTS_RECORDED | CLOSED
  usage_decision,            -- ACCEPT | REJECT | ACCEPT_WITH_DEVIATION | REWORK | SCRAP
  decision_by, decision_at,
  created_at, due_date
)
inspection_characteristic_result(
  lot_id, characteristic_id, sample_number,
  measured_value, unit, qualitative_result,
  lower_spec, upper_spec, target,
  evaluation,                -- OK | NOK
  inspector_id, recorded_at, equipment_id
)

Inspection lots are created automatically by: goods receipt, production confirmation, delivery creation, batch expiry re-inspection, or a periodic stock inspection schedule.

Inspection plans

Inspection plan for Fabric RM-300, incoming inspection

Char  Description        Type          Target  LSL    USL   Method     Sample
0010  Visual defects     Qualitative   —       —      —     Visual     AQL 2.5
0020  GSM (weight)       Quantitative  180     175    185   Balance    5 pcs
0030  Colour match       Qualitative   —       —      —     Lightbox   3 pcs
0040  Shrinkage %        Quantitative  3.0     —      4.0   Wash test  2 pcs
0050  Tensile strength   Quantitative  450     400    —     Tensometer 3 pcs

Characteristic types:

  • Quantitative — a measured value against a specification range
  • Qualitative — pass/fail against a catalogue of defect codes
  • Required vs optional — some characteristics are mandatory for the usage decision
  • Destructive — the sample is consumed and must be scrapped

Sampling

Testing everything is usually impossible or uneconomic. Statistical sampling decides how much to check.

AQL — Acceptable Quality Level (ISO 2859 / ANSI Z1.4)

Lot size 1,200, General Inspection Level II, AQL 2.5

→ Sample size code letter K → sample 125 units
→ Accept if ≤ 7 defects, reject if ≥ 8

Skip-lot and reduced inspection: a supplier with a consistent record earns reduced sampling; a failure moves them to tightened inspection. This is both a cost saving and a supplier incentive.

Sampling procedures

  • 100% inspection — critical characteristics, safety items
  • Fixed sample — always N units
  • Percentage — 5% of the lot
  • AQL-based — statistically derived, the standard for incoming goods
  • Skip lot — inspect every Nth lot
  • Dynamic modification rules — the level moves automatically based on recent history

Usage decision

The formal outcome that releases or blocks the stock:

Decision Stock movement
Accept Inspection stock → unrestricted
Accept with deviation Unrestricted, with a documented concession and approval
Rework To rework order, then re-inspect
Reject / return to vendor Return delivery, vendor claim
Scrap Written off
Downgrade Moved to a lower-grade material or valuation type

The decision must be traceable: who decided, when, on what evidence, and under what authority. In regulated industries only a qualified person (QP) may release, and the system must enforce that.

Statistical Process Control (SPC)

Monitoring a process to detect drift before it produces defects.

Control chart (X-bar and R):

UCL ─────────────────────────────────────
                    ●
              ●          ●
CL  ──────●───────●───────────●──────────
        ●                          ●
                                        ●
LCL ─────────────────────────────────────

Western Electric / Nelson rules flag out-of-control conditions:

  1. Any point beyond 3σ
  2. 9 consecutive points on one side of the centre line
  3. 6 consecutive increasing or decreasing
  4. 14 alternating up/down
  5. 2 of 3 beyond 2σ on the same side

Process capability

Cp  = (USL − LSL) / 6σ           potential capability
Cpk = min[(USL − μ), (μ − LSL)] / 3σ    actual, accounting for centring

Cp = 1.33 → capable (4σ)
Cp = 2.00 → six sigma
Cpk < Cp  → the process is capable but off-centre

The Cp vs Cpk gap is diagnostic: if Cp is fine and Cpk is poor, you don’t need a better machine, you need to re-centre the setting. That distinction saves capital expenditure.

Non-conformance and CAPA

Non-conformance detected
      ▼
NC record: what, where, when, how much, severity
      ▼
Immediate containment: quarantine stock, stop the line, trace forward and back
      ▼
Investigation: root cause analysis
      ▼
Correction:  fix this instance
Corrective:  fix the cause so it doesn't recur
Preventive:  fix similar risks elsewhere
      ▼
Effectiveness check (after N days/units — did it actually work?)
      ▼
Close

Root cause techniques: 5 Whys, Ishikawa/fishbone (Man, Machine, Material, Method, Measurement, Environment), 8D (the automotive standard), FMEA, fault tree analysis.

The effectiveness check is the step everyone skips, and it’s the one that distinguishes a real CAPA system from a paperwork exercise. If you build CAPA workflow, make the effectiveness check a mandatory, scheduled, un-skippable task.

Certificates

Certificate Content
CoA — Certificate of Analysis Actual measured results for a specific batch
CoC — Certificate of Conformance A statement that it meets specification
Mill certificate / EN 10204 3.1 Material composition, for metals
Test report Full inspection results

Customers demand CoAs with every shipment in chemicals, pharma, food, and metals. The CoA is generated from inspection results for that specific batch — which means the traceability chain from delivery → batch → inspection lot → characteristic results must be complete and queryable. Build it as a report early; it’s requested constantly.

Supplier quality

supplier_quality_score(
  vendor_id, material_group, period,
  ppm_defective,              -- parts per million
  lots_accepted, lots_rejected, acceptance_rate,
  on_time_delivery_pct,
  complaint_count, complaint_severity_weighted,
  corrective_action_response_days,
  audit_score, certification_status,
  overall_score, classification    -- A | B | C | BLOCKED
)

Uses: source list restriction (only A and B suppliers for critical materials), quota arrangements weighted by score, inspection level (A suppliers get skip-lot), and commercial negotiation.

Supplier complaints / 8D — a formal claim to the vendor with a required response, tracked to closure, often with a cost recovery claim attached.

Quality costs

The classic framework — and the argument for investing in prevention:

Category Examples
Prevention Training, process design, supplier development, FMEA
Appraisal Inspection, testing, calibration, audits
Internal failure Scrap, rework, downgrading, re-inspection
External failure Warranty, returns, recalls, complaints, lost customers, liability

The rule of ten: a defect costs ~10× more to fix at each stage it escapes. Caught at incoming inspection: ₹100. On the line: ₹1,000. At final inspection: ₹10,000. At the customer: ₹100,000. In a recall: unbounded.

A quality cost report by category is a genuinely high-impact thing to build, because it converts quality from a compliance conversation into a financial one.

Standards and regulation

Standard Domain
ISO 9001 General quality management systems
IATF 16949 Automotive — adds APQP, PPAP, FMEA, MSA, SPC
AS9100 Aerospace
ISO 13485 Medical devices
GMP / cGMP Pharma and food manufacturing
HACCP / ISO 22000 / FSSC Food safety
21 CFR Part 11 FDA electronic records and signatures
ISO 17025 Testing laboratory competence

Automotive core tools (IATF 16949)

  • APQP — Advanced Product Quality Planning, the phased launch process
  • PPAP — Production Part Approval Process; the customer approves your part and process before you may ship
  • FMEA — Failure Mode and Effects Analysis, with Risk Priority Numbers
  • MSA — Measurement System Analysis (gauge R&R): is your measuring device itself reliable?
  • SPC — as above

If you work on an automotive supplier’s ERP, these five acronyms will appear in every requirement document.

Calibration

Measuring equipment that has drifted invalidates every measurement it took since the last good calibration.

equipment(id, code, type, location, manufacturer, serial,
          calibration_interval_days, last_calibration, next_calibration,
          status, certificate_reference)

Requirements: calibration schedule with alerts, block use of overdue equipment, retain certificates, and — critically — traceability from inspection results back to the equipment used, so that a failed calibration can trigger a review of everything it measured.

Developer notes

  1. Inspection lots are created automatically by other processes. Get the triggers right, or QC never sees the stock.
  2. Stock in inspection is a distinct stock type — not available to sell, but on the balance sheet.
  3. Usage decision drives a stock movement. They are one transaction, not two.
  4. Results are append-only. A correction is a new recorded result with a reason, never an overwrite.
  5. CoA generation must be a first-class report from batch + inspection results.
  6. Specification limits are versioned and dated. A batch is judged against the spec in force at the time.
  7. In regulated environments: audit trail on everything, electronic signature on decisions, and a validated system. Design for it from the start; retrofitting Part 11 compliance is brutal.